Goroutine Lifecycle
Start with Goroutine Lifecycle
In this lesson, explore goroutine lifecycle through one small Go program, and connect its output to the language rules behind it.
What you’ll learn
- Explain the main purpose of goroutine lifecycle.
- Read and run the complete Go example in this lesson.
- Apply the concept and recognize common mistakes.
Understand the idea
A goroutine is created, scheduled, can block while waiting for data or a lock, and eventually returns. Returning from main ends the process; other goroutines are not automatically joined.
A clear lifetime contract identifies who starts the task, what can stop it, and who waits for it.
Visualize how it works
Follow this diagram before executing the example. Check where a value or decision changes what runs next.
Run a complete Go example
This example is a complete program. Save it as main.go or paste it into the Go Playground.
Go code
package main
import (
"fmt"
"sync"
)
func main() {
var wg sync.WaitGroup
wg.Add(1)
go func() {
defer wg.Done()
fmt.Println("Worker completed")
}()
wg.Wait()
fmt.Println("Main can exit")
}
Output
Worker completed
Main can exitTrace what the program does
Wait keeps the main goroutine active until the worker calls Done. The deferred call also runs on normal return from the worker.
Avoid common mistakes
- Do not use arbitrary sleep durations as a completion guarantee.
- If Done is never called, Wait can remain blocked.
Try it yourself
Create two workers and ensure both report completion before main exits.
Tip: Edit the example above, predict the output, and run the modified code to test your reasoning.
Check your understanding
What you should remember
You have practiced Goroutine Lifecycle in a small, self-contained program. The important habit is to predict what runs, inspect the actual output and distinguish the language rule from the particular example.
Before continuing, make sure you can explain the program to someone who has not seen it, including the line that changes its result.
Reaching the recap and completing the quizzes are separate milestones.